Monday, 23 March 2009

Swiss Air lines


The Swiss air line development of the 747 was a huge undertaking. Boeing did not have a factory large enough to assemble the giant aircraft, so the company built an all new assembly building near Everett, Washington. This factory is the largest building ever built. Pratt and Whitney developed a massive high-bypass turbofan engine, the JT9D, that was, in the beginning, exclusively for the 747. To appease concerns about the safety and flyability of such a massive aircraft the 747 was designed with four backup hydraulic systems, split control surfaces, multiple structural redundancy, and sophisticated flaps which allow it to use standard length runways.

No comments:

Post a Comment